Your Partner In Power

Jeovy Engineering Limited (Jeovy) is a power consulting firm, registered with COREN with expertise in power distribution networks, transmission lines and substation designs. The strength lies in the team, consisting of qualified engineers and professionals with vast practical experience in the Nigerian Power Industry.

.

Sign Up For Our Newsletter

Who We Are

The professional team at Jeovy Engineering (Nig) Ltd has been involved in a wide range of major projects over many years in Nigeria. These projects have ranged from initial engineering studies through to the planning, design and construction supervision of distribution networks and successful commissioning of HV, MV and EHV substations, transmission lines, and associated automation and control, protection and communications systems

Range of Services:

1. Engineering feasibility studies and investigations
2. Total project management
3. Distribution planning and design, rehabilitation and construction supervision
4. Substation design, automation, installation, testing and commissioning
5. Transmission line design, site supervision, commissioning
6. Protection and control system design
7. Preparations of tender specifications and documentation
8. Tender evaluation, contract negotiation and administration
9. Assistance in the procurement of various equipment and goods for power projects
10. Research and development

Our Clients & Partners

We work closely with partners across the globe to successfully executed project for the following Clients;

SEACOF Engineering Service
Zamfara State Government
Unitex Textile
Jibs Engineering Limited
UNTL, Kaduna
Jema’a L.G.A Kaduna
Inland Bank Plc
First Atlantic Bank
Standard Trust Bank
Batola Electricals
Transmission Company of Nigeria
Basillec Company, Abuja
Rosebill Ltd
Kenfili Ltd
Power Holding Company of Nigeria
Axonn Link Ltd
Digitplus Engineering Limited
Brentex Petroleum

Work Experience

Jeovy Engineering has executed high profile project among which are the following

Erection of 42km overhead line and Installation of 150nos 50kVA Transformers at Agege Cluster; March 2011
Installation of 390km Optic Fiber Underground cables; Sept 2010
Construction of dedicated 11KV line. August,1997
Construction of a dedicated 11KVA line to Zamfara water plant. May ,2005
Installation of a 1.5MVA Transformer. July, 2005
Construction of 67km Gusau-K/Namoda 33KV line. October 1999
Construction of a 13km T.D.N and 12km I.C.T 33KV line. March 2005
Construction of 37km 33kv line. March 2005
Installation of 100KVA transformer. March, 2002
Installation of a 200KVA transformer. November, 2003
Installation of a 100KVA transformer. April 2003
Installation of a 200KVA Transformer. April , 2007
Supply of transformer to Jema-a LGA, 2009
Installation of a 200KVA 11/0.415KV. April 1994
Installation of high tension panels. February 1995
Servicing of high tension panels. October 1995
Installation of 11KV RMU May 1996

Contact Information

  • Address: APO Legislative Quarters. Zone D, 1st gate, Adeyinka Adebayo Street, Plot 291/296 Royal Apartments APO, Abuja
  • Phone Number: +234 8033051744
  • Email: info@jeovyeningeering.com
  • Alternate Email: jciroma@gmail.com